SurgeArrest®

PM Series

Contents

 

INTRODUCTION

1

Installation

1

Testing

1

UNPACKING AND PRELIMINARY INSPECTION

 

Unpacking and Preliminary Inspection

2

Storage

2

LOCATION CONSIDERATIONS

 

Environment

2

Audible Noise

2

Mounting and Cabinet Data

2

Service Clearance

3

Equipment Performance

3

Product Orientation

3

ELECTRICAL CONNECTIONS

 

Overcurrent Protection

3

Voltage Rating

3

Terminals

4

System Grounding

4

Parallel Connection

4

Wire Size & Installation Torque

5

Disconnect Switch and Circuit Breaker

5

PM SERIES INSTALLATION INSTRUCTIONS

 

Installation Instructions

6

Configuration and Wiring Diagrams

7

OPERATION

 

Operation and Features

9

Status Panel Controls, Indicators and Alarms

9

Surge Counter Option

10

Dry Contacts Option

10

MAINTENANCE

 

Periodic Inspection and Cleaning

11

Corrective Maintenance and Repairs

11

Troubleshooting

11

GENERAL INFORMATION

 

Limited Warranty

17

Technical Support

17

TABLES

 

Table 1 - Cabinet Dimensions and Weight

2

Table 2 - Voltage Rating and Service Type (by Model)

4

Table 3 - DB-9 Pin Configuration

10

Table 4 - Replacement Parts List

16

i

Page 3
Image 3
American Power Conversion PM4Y, PM3 user manual PM Series