American Power Conversion Smart-UPS VT, XR operation manual Installation

Models: XR Smart-UPS VT

1 56
Download 56 pages 6.63 Kb
Page 29
Image 29

Operation – Front Panel Removal/Installation

Installation

BATTERY UNIT

 

BATTERY UNIT

BATTERY UNIT

 

 

BATTERY UNIT

BATTERY UNIT

 

BATTERY UNIT

BATTERY UNIT

 

BATTERY UNIT

BATTERY UNIT

 

BATTERY UNIT

BATTERY UNIT

 

 

BATTERY UNIT

BATTERY UNIT

 

BATTERY UNIT

BATTERY UNIT

 

BATTERY UNIT

Insert the two protrusions at the bottom of the Front Panel into the two slots at the bottom of the Enclosure.

Push the Front Panel into place.

To secure the Front Panel, turn the screw counterclockwise to locked position.

990-1599B Smart-UPS® VT 10-30 kVA, 208/220 V and XR Battery Enclosure Operation Manual

21

Page 29
Image 29
American Power Conversion Smart-UPS VT, XR operation manual Installation