INSTALLATION INSTRUCTIONS
CARE AND MAINTENANCE
FloWise™ DUAL FLUSH 2-PIECE TOILET
Model 2479.216 / 2479.516 | / 2476.216 | / 2476.516 | / 2779.516 |
|
Model 2480.216 / 2480.516 | / 2484.216 | / 2484.516 | / 2778.516 / | Certified by |
2566.216 Right Height™
IAPMO R&T
Thank you for selecting American Standard - the benchmark of fine quality for over 100 years. To ensure this product is installed properly, please read these instructions carefully before you begin. (Certain installations may require professional help.) Also be sure your installation conforms to local codes.
!CAUTION: PRODUCT IS FRAGILE. TO AVOID BREAKAGE AND POSSIBLE INJURY HANDLE WITH CARE!
NOTE: Pictures may not exactly define contour of china and components.
RECOMMENDED TOOLS AND MATERIALS
Putty Knife | Regular Screwdriver | Adjustable Wrench | Sealant | Tape Measure |
Hacksaw | Wax Ring/Gasket | Flexible Supply Tube | Closet Bolts | Carpenters Level |
1REMOVE OLD TOILET
a.Close toilet supply valve and flush tank completely. Towel or sponge remaining water from tank and bowl.
b.Disconnect and remove supply line.
NOTE: If replacing valve, first shut off main water supply!
c.Remove old mounting hardware, remove toilet and plug floor waste opening to prevent escaping sewer gases.
d.Remove closet bolts from flange and clean away old wax, putty, etc. from base area.
NOTE: Mounting surface must be clean and level before new toilet is installed!
2 |
|
|
|
|
| Models: 2480.216 / 2480.516 / 2484.216 / 2484.516 / | |||||||||
|
|
|
|
| 2778.516 / 2566.216 Right Height™ |
| |||||||||
|
|
|
| Models: 2479.216 / 2479.516 / |
|
|
|
| |||||||
|
|
|
| 2476.216 / 2476.516 / 2779.516 |
|
|
| FINISHED WALL |
|
|
| ||||
|
| FINISHED WALL |
|
|
|
| 794mm |
|
|
| |||||
|
|
|
| 794mm |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| 41mm ± 6mm |
|
| 432mm | ||
|
| 41mm ± 6mm |
|
|
|
|
|
|
|
|
| ||||
|
|
|
|
|
| 432mm |
|
|
| 197mm |
|
|
| (17) | |
|
|
|
|
|
|
|
|
|
|
|
| PUSH | |||
|
| 197mm |
|
|
|
| (17) |
|
|
|
|
|
| BUTTON | |
|
|
|
|
|
| PUSH |
|
|
|
|
|
| |||
|
|
|
|
|
| BUTTON |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| 470mm |
|
| C/L |
|
|
|
| 470mm |
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
| C/L |
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| C/L OF SEAT POST HOLES |
|
| |
|
|
|
| C/L OF SEAT POST HOLES |
|
|
|
|
|
| 140mm |
|
| ||
|
|
|
| 140mm |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
| *SUPPLY |
|
|
|
|
|
|
| SUPPLY |
|
|
|
|
|
|
| AS | 829m |
|
|
|
|
|
|
|
|
|
|
|
|
| REQ'D | ||
|
|
|
|
|
| AS |
| 765mm | 111mm |
|
|
|
| ||
111mm |
|
|
| 375mm | REQ'D |
|
|
|
|
| |||||
|
|
|
|
|
|
|
| ||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
| 448mm |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 203mm | 370mm | |
|
|
|
|
|
| 203mm | 371mm |
|
|
|
|
|
| (8) | |
|
|
|
|
|
| (8) |
|
|
|
|
|
|
|
| |
|
| 121mm |
|
|
|
|
|
|
|
| 121mm | 410mm |
| 114mm |
|
|
|
| 397mm |
| 114mm |
|
|
|
| FINISHED |
| ||||
|
|
|
|
|
|
|
|
| |||||||
|
|
| FINISHED |
|
|
| 305mm | FLOOR |
| 265mm | |||||
|
|
| 251mm |
|
|
|
| ||||||||
|
| 305mm |
|
| FLOOR |
|
|
| C/L OF OUTLET |
|
| ||||
|
| C/L OF OUTLET |
|
|
|
| (12) |
|
| ||||||
|
| (12) |
|
|
|
|
|
|
|
| |||||
|
|
|
|
|
|
|
|
|
|
|
| ||||
3 | CLOSET |
| 4 |
|
|
|
| 5 |
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
| |||
|
| FLANGE |
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
| A |
| SEALANT | WAX RING |
|
|
|
| BOLT | |||
|
|
|
|
|
|
|
|
|
|
|
| CAP | |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| NUT |
|
| CLOSET |
|
|
|
|
|
|
|
|
|
|
|
| TAPERED |
|
| BOLTS |
|
|
|
|
|
|
|
|
|
|
|
| WASHER |
| INSTALL CLOSET BOLTS |
|
|
|
|
|
|
|
|
| CLOSET |
| |||
| Install closet bolts in flange channel, |
|
|
|
|
|
|
|
| BOLT |
| ||||
| turn 90°, and slide into place 6" |
|
|
|
|
|
|
|
|
|
|
| |||
| (152mm) apart and parallel to wall. |
|
|
|
|
|
|
| FLANGE |
|
| ||||
| TEMPORARILY set toilet in place. |
|
|
|
|
|
|
|
|
| |||||
|
|
|
|
|
|
|
|
|
|
| |||||
| Place tapered washer and nuts onto | INSTALL WAX SEAL |
|
|
|
|
|
|
|
| |||||
| the bolts as shown in Step 5. Mark bolt |
|
|
| POSITION TOILET ON FLANGE |
|
| ||||||||
| Invert toilet on floor (cushion to |
|
|
|
| ||||||||||
| length needed for bolt cap clearance. |
|
|
|
| ||||||||||
| Remove toilet. Precut the bolts to | prevent damage), and install wax | a. Unplug floor waste opening and install toilet on closet flange | ||||||||||||
| length by twisting the nut onto the bolt | ring evenly around waste flange |
|
| so bolts project through mounting holes. |
| |||||||||
| past the cut mark, then cutting the bolt | (horn), with tapered end of ring |
|
| b. Loosely install retainer washers and nuts. Side of washers | ||||||||||
| to the desired length with a hacksaw. | facing toilet. Apply a thin bead of |
| marked "THIS SIDE UP" must face up! |
| ||||||||||
| Unscrew the nut to repair the threads. | sealant around toilet base. |
|
|
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
|
|
|
|
P r o d u c t n a m e s l i s t e d h e r e i n a r e t r a d e m a r k s o f A S A m e r i c a I n c . | |
© A S A m e r i c a I n c . 2 0 0 8 |