1INSTALL SWEAT SOLDER ADAPTER; Fig. 3
CAUTION | Turn water supplies off |
before beginning |
Note: Install Optional Sweat Solder Adapter (Supplied) for copper pipe supply line. Fig. 3.
1.Measure the distance (A) from the finished wall to the center of the inlet spud on the fixture.
2.Cut the supply pipe
3.Clean the end of the supply pipe. Push the threaded Adapter on until it is seated against the internal stop. Sweat the Adapter to the pipe.
2INSTALL COVER TUBE, WALL
ESCUTCHEON and SUPPLY STOP; Fig. 4
1. Measure from finished wall to first thread of Adapter |
or threaded supply pipe (dimension “X”). Cut COVER |
TUBE (1) to length (X). Apply Teflon Tape to the |
threaded end of the Adapter or supply pipe. Fig. 4a. |
2. Push the COVER TUBE (1) into the WALL |
ESCUTCHEON (2). Slide both onto the SUPPLY PIPE |
(3). Fig. 4b. |
3. Push the COVER TUBE (1) in to expose the threads |
of the supply pipe. Fig. 4c. With a wrench thread the |
SUPPLY STOP (4) onto the SUPPLY PIPE (3). Align |
and tighten. Fig. 4c. |
4. Pull COVER TUBE (1) against SUPPLY STOP (4) |
and push WALL ESCUTCHEON (2) against finished |
wall. |
Fig.3Fig.3a
FINISHED WALL
CENTER LINE OF
FIXTURE SPUD
|
|
|
| A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
| B |
|
| ||||||
|
|
|
| ||||||||
|
| C |
|
|
|
|
|
| 32mm | ||
|
|
|
|
|
|
|
| ||||
FILE EDGES |
| ||||||||||
|
|
|
CLEAN
ADAPTER
| SOLDER |
|
| ADAPTER |
|
Fig. 4 | FINISHED WALL |
|
Fig. 4a | X |
|
|
| |
|
| TEFLON TAPE |
Fig. 4b |
| 2 |
|
| 1 |
| 3 |
|
| 2 | X |
|
| |
Fig. 4c |
| 4 |
1
3INSTALL DOWN TUBE AND VACUUM BREAKER; Fig. 5
1.Place the SPUD FLANGE (1) over the spud on the Fixture.
2.Thread SPUD COUPLING NUT (2) onto Spud. Make sure SEAL WASHER (3) and FRICTION WASHER (4) are installed. Do not tighten fully.
3.Insert the DOWN TUBE (5) into the SPUD COUPLING NUT (2) and push it down.
Note: If cutting Down Tube (5) to size, note that Critical Line (C/L) on Vacuum Breaker must typically be 6" (152mm) above fixture. Consult
Code for details.
Fig. 5
5
2
1
3
4
3/4" TOP SPUD
3 | M968567 Rev.1.2 |
|