Contents

1.0

Introduction

5

1.1

Tools and Equipment

5

2.0

Unpacking

6

3.0

Installation

8

3.1

Requirements on Site

8

3.1.1

Cabinet Dimensions H*xWxD - 1400xWx800 [mm]. Width as in below table:

8

3.2

Footprint

9

3.2.1

800mm Cabinet for 60-80kW UPS

9

4.0

External Connection

10

4.1

Connecting the UPS

10

4.2

System Integration Interface

12

4.2.1

Connections

13

4.3

Parallel Board

14

4.4

Communication Interface Board

17

4.4.1

Connections

17

4.5

Connecting of APC Silcon Tripel Chassis

18

4.6

APC Silcon Triple Chassis

19

4.6.1

Safety Warnings

19

4.6.2

Product Description

19

4.6.3

Installing Management Peripherals

20

4.6.4

Powering the APC Silcon Triple Chassis

22

4.6.5

Troubleshooting

23

4.6.6

Product Specifications

24

4.7

APC Silcon Battery Cabinets

27

4.7.1

APC Silcon Battery Cabinets

28

4.8

Battery Breaker Box/Fuse-box

30

4.8.1

Battery Breaker Box

31

4.8.2

Battery Breaker Box Connection Diagram

32

4.8.3

Fuse-box

33

4.8.4

Fuse-box Connection Diagram

34

4.8.5

UPS with External Battery in Battery Breaker Box/Fuse-box Configuration

35

5.0

Programming Parameters

36

5.1

Parameters

36

5.1.1

Programming Keys

37

5.1.2

Programming Example - Switch to Bypass Operation

38

5.2

System Configuration

38

5.2.1

Programming Example - Change Charge Voltage to 446

40

5.2.2

Programming Example - Change to Output Isolation Transformer available

41

5.3

Programming Parameters for Advanced Parallel Operation

42

5.3.1

Description of Settings

42

5.3.2

Programming example

43

5.4

Battery Monitor

43

5.4.1

Installation of new batteries

43

6.0

Options/Accessories

44

6.1

Service Bypass Panel for Single Operation

44

6.1.1

Wiring up UPS with SBP in TN-C-S Network

46

6.1.2

Wiring up UPS with SBP in TN-S Network

46

6.1.3

Operating The External Service Bypass Switch

47

6.2

Service Bypass Panel for Parallel Redundant Operation

49

6.2.1

Two Parallel Systems with Service Bypass Panel

50

6.2.2

Parallel/Redundant Operation with Service Bypass Panel and External Battery

 

 

via MCCB

51

6.2.3

Operating External Service Bypass Switch for Parallel Systems

52

6.2.4

Isolating One UPS for Service/Maintenance

56

6.2.5

Switching Back to Normal Parallel/Redundant Operation

57

6.3

Intersystem Synchronization Unit

58

6.4

Relay Board

59

 

 

990-4051

 

 

Installation Guide APC Silcon 60-80kW 400V UPS

3

Page 3
Image 3
APC 60-80kW manual Contents