How to Install Multiple Management Cards

Overview

When installing more than one APC management card, you must install the cards in the order described in this document because they share a serial link with the connected UPS. Installing the cards in any other order may result in failure for them to operate properly.

Before you start

The following table identifies the priority of the management cards you will be installing. Management cards that have more control over the UPS have higher priority.

Level 6: Exerts total control

Level 5: Exerts wide, but not total, control

Level 4: Exerts limited control

Level 3: Passes commands to the UPS

Level 2: Exerts no control

Level 1: Exerts no control and must be installed closest to the UPS

Management Card

Priority

 

 

Network Management Card1 (AP9630, AP9631)

Level 6

Out-of-Band Management Card (AP9608)

Level 5

 

 

Relay I/O Module (AP9610)

Level 4

 

 

Interface Expander Card (AP9607)

Level 3

 

 

Building Management Integration Card2 (AP9622)

Level 2

Environmental Monitoring Card (AP9612TH)

Level 1

 

 

 

1.

Attach no more than two Network Management Cards to a UPS.

2.

Attach only one Building Management Integration Card to a UPS.

 

 

 

Two models of expansion chassis

If you need management card slots in addition to those in your UPS, use one or more expansion chassis available from APC.

Chassis

Compatible UPSs

 

 

Expansion Chassis (AP9600), one slot

APC UPSs that are not installed in

 

a rack or enclosure.

 

 

Triple Expansion Chassis (AP9604BLK), three slots

All APC UPSs

 

 

18

Installation Manual

Page 22
Image 22
APC AP9630 installation manual How to Install Multiple Management Cards, Before you start, Two models of expansion chassis