ASSEMBLY

WARNING: AVOID INJURY. Read and understand the entire Safety section before proceeding.

WARNING: Dropping or tipping over boxed unit could result in personal injury or damage to unit.

PACKAGE CONTENTS

2

1

3

4

1. Discharge Chute

3. Sno-Thro Unit

2. Discharge Chute

4. Literature Pack with

Handle (939001, 002)

Extra Shear Bolts

Figure 3

ASSEMBLY

Tools Required:

Pliers

Open-End Wrenches: 3/8, 7/16, 1/2, 9/16 in. and/or Adjustable Wrench

Tire Gauge

Unfold Handlebar (Figure 4)

1.Remove the lower and loosen the upper hardware on the handlebar assembly.

2.Rotate the handlebars into operating position.

3.Install and tighten the hardware on the handlebar assembly.

1. Lower

3. Upper

Handlebar

Handlebar

2. Hardware

 

Figure 4

OS7035

Install Discharge Chute

(Figure 5)

1.Grease underside of discharge chute ring (if not already greased).

2.Remove mounting hardware from the bottom of the chute pedestal.

3.Install discharge chute over opening in the auger housing and secure pedestal to auger housing with hardware removed in step 2.

1

2 3

4

1

1. Mounting Hardware

3. Discharge Chute Ring

2. Discharge Chute

4. Chute Pedestal

 

 

Figure 5

OS7050

 

OS7055

GB - 7