Wheel Drive Actuation Link | Operator Presence Control (OPC) | |||||||||||||
Installation | Cable Installation |
|
|
| ||||||||||
See Figure 6. | See Figure 7. |
|
|
| ||||||||||
10. Apply pressure against the wheel drive | NOTE: The OPC lever (Figure 15, Item 1) is | |||||||||||||
mounted on the | ||||||||||||||
against rear wheels. This will provide the | handlebar. The OPC cable is routed down the | |||||||||||||
required clearance to install the wheel | right side of the handlebar to the front of the | |||||||||||||
drive actuation link on the bellcrank stud. | engine. |
|
|
| ||||||||||
11. Install a flat washer, the actuation link |
| 1. Connect OPC cable end to front of | ||||||||||||
and a second flat washer on bellcrank |
| engine. The | ||||||||||||
stud. |
| installed into the engine flywheel brake | ||||||||||||
12. Install hairpin through bellcrank stud to |
| actuation arm through the bottom side. | ||||||||||||
secure actuation link. |
| 2. Slide cable wire through slot in cable | ||||||||||||
|
|
|
|
|
|
|
|
| mounting bracket. |
|
|
| ||
Bellcrank |
|
|
| |||||||||||
| 3. Press cable clip into bracket hole from | |||||||||||||
|
|
|
|
| Wheel |
| backside until tabs lock clip in place. | |||||||
|
|
|
|
| Drive |
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
| Actuation |
|
|
|
|
|
|
| ||
|
|
|
|
| Link |
|
|
|
|
|
|
| ||
|
|
|
|
| Flat |
|
|
|
|
|
|
| ||
|
|
|
|
| Washer |
|
|
|
|
| Oil | |||
|
|
|
|
|
|
| ||||||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
| Bellcrank |
|
|
|
|
|
|
| Fill | |
|
|
|
|
| Stud |
|
|
|
| OPC | Engine |
|
| |
|
|
|
|
|
|
|
| |||||||
|
|
|
|
|
|
|
|
|
|
|
| |||
| Hairpin |
| Cable End | Flywheel |
|
| ||||||||
| Cable Clip | Brake | Cable | |||||||||||
|
|
|
|
|
|
|
| Actuation | ||||||
|
|
|
|
|
|
|
| Mounting | ||||||
|
|
|
|
|
|
|
|
|
|
| Slot | Arm | Bracket | |
|
|
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Front of Engine)
Figure 6
Figure 7
GB - 10