Electrical Connection
WARNING - THIS APPLIANCE MUST BE EARTHED
The cooker must be connected to the mains power by a licensed electrician.
The electrical supply for the cooker must be 240 Volt 50 Hz.
1.The fuse and electrical wiring of the home/ premises must support the load of the appliance.
2.The appliance must be earthed.
3.(New Zealand statutory warning): The cooker must be connected to the electricity supply by a cable fitted with an appropriately rated plug that is compatible with the
4.The appliance must be connected to the mains by means of a double pole switch with a minimum contact opening of 3 mm. The
5.IMPORTANT If a power socket needs to be installed or relocated, the work must be done by a licensed electrician.
Mounting A Power Supply Cable
Open the terminal board by inserting a screwdriver into the side tabs of the cover. Use the screwdriver as a lever to open the cover.
Loosen the cable clamp screw and remove it Remove the wire contact screws
Once the connections have been made, tighten all the terminal screws fully.
Fasten the supply cable in place with the clamp and close the cover of the terminal board.
The supply cable should be positioned so that it is not subject to direct heat and so that it does not reach a temperature of more than 50°C higher than room temperature, along its length. If there is a risk that the cable will come into contact with parts having such a temperature rise, then fixed wiring insulation must be protected using an insulating sleeve of an appropriate temperature rating.
Before making the connection, check that the home electrical system can support the appliance load (see data plate).
NB: Never use reducers, adaptors or shunts since they can cause heating or burning.
The socket or
Disconnecting the cable |
| |
AUS | ||
Ensure that the means for disconnection of the | ||
power cable is incorporated into the fixed wiring in |
| |
| ||
accordance with local wiring rules. |
| |
Sufficient cable should be used to allow the cooker |
| |
to be pulled out for servicing. |
|
INSTALLATION & OPERATIONAL
CHECKS
Post Installation Checks
Perform post installation checks and ensure proper and safe operation before leaving. Test all burners individually and in combination.
Leak Check
"Ensure all gas control knobs are in the Off position.
"Ensure the gas supply is switched on.
"Spray a solution of soapy water onto all gas joints as well as the full length of any flexible hoses.
UNDER NO CIRCUMSTANCES USE A NAKED FLAME IN CHECKING FOR LEAKS.
If bubbles appear anywhere, turn the gas supply off, check all connections and retest. If satisfactory operation cannot be achieved, contact place of purchase or their appointed agent for service.
Flame check
Turn each burner on, and ensure that the flame is blue with minimal yellow tipping. If there is significant yellow tipping, flame lift off or excessive noise, check pressure and adjust at the regulator if necessary.
If satisfactory operation cannot be achieved, contact place of purchase or their appointed agent for service.
Igniter operation
Check that the igniter for each burner successfully ignites the gas.
If an igniter fails to work, first remove the plug from the electrical power outlet, and then check that all the electrical connections are in place.
If satisfactory operation cannot be achieved, contact place of purchase or their appointed agent for service.
29