CN8600 User Manual

Note: Dual power operation is optional – the second power source is for back-up; a second power adapter requires a separate purchase

11. Power on the CN8600, then power on the server/KVM switch.

Note: For safety reasons, we suggest you ground the switch using a grounding wire.

1

Over-IP PDU

 

 

Over-IP devices

7 8

 

4

3

2

5

6

 

 

 

9

10

 

 

 

 

 

 

 

 

 

Network

2

DVI KVM Cable Connection

16