KL1116 User Manual
(Continued from previous page.)
b)Power up each daisy chained station on the installation in turn (Second Station, then Third Station, etc.). Each KH0116 has an LED display on its front panel to indicate its Station ID (the Station ID for the First Stage unit (KL1116) is 01, the ID for the Second Stage unit (the first KH0116) is 02, the ID for the Third Stage unit is 03, etc.). In each case, wait for the Station ID to be ascertained and displayed on the Station ID LED before plugging in the next Station.
c)After all the stations are up, power on the computers.
Daisy Chain Installation Diagram
KL1116
KH0116
14