Chapter 3. Operation
Verification
After entering a command, a verification message appears at the end of the command line as follows:
command ok- indicates that the command is correct and successfully performed by the switch
command incorrect - indicates that the command has the wrong format and/or values.
Powering Off and Restarting
If you power off the VS0102 / VS0104 / VS0108, follows these steps before powering it on again:
1.Power off the attached devices.
2.Unplug the power adapter cable from the VS0102 / VS0104 / VS0108.
3.Wait 10 seconds, and then plug the power adapter cable back in.
After the VS0102 / VS0104 / VS0108 is powered on, power on the attached devices.
19