4 2Index
Approved Vent Configurations | .......................... | |
Adjusting the Blower Speed | 28 | |
Adjusting the Flame Height | 27 | |
Air Shutter Adjustment | 21 | |
Altitude Considerations | 10 | |
Blower Control | 28 | |
BTU Input | 6 | |
BTU Output | 6 | |
Cap (see vent termination) | 19 | |
Chimney Cap (see vent termination) | 19 | |
Clearances | 8 | |
Condensation on Glass | 27 | |
Corner Installation | 8 | |
Dimensions | 6 | |
Elbows | 12 | |
Finalizing the Installation | 20 | |
Floor Protection | 9 | |
Fuel | 4 | |
Gas Control Valve (Location) | 25 | |
Gas Inlet Pressure | 10 | |
Gas Line Connection | 10 | |
Gas Line Install | 10 | |
Gas Smell | See Inst. on Cover | |
Glass Installation and Removal | 22 | |
Hearth Requirements | 9 | |
Heating Specifications | 6 | |
Horizontal Vent Termination Requirements | 19 | |
How this Stove Works | 31 |
Installation Options | 6 | |
Items Required for Installation | 7 | |
Leaking Gas | See Inst. on Cover | |
Listing Information | 33 | |
Location of Controls | 25 | |
Log Set Installation and Removal | 24 | |
Maintenance | 29 | |
Measuring Vent Lengths | 12 | |
Noise (see Normal Operating Sounds) | 28 | |
Normal Operating Sounds | 28 | |
Packing List | 7 | |
Pilot Flame Inspection | 20 | |
Piping Installation (see Gas Line Install) | 10 | |
Restrictor Position | 12 | |
Safety Label | 33 | |
Safety Precautions | 4 | |
Starting The Pilot | 26 | |
Starting the Stove for the First Time | 27 | |
Thermostat Operation | 27 | |
Turning the Stove On and Off | 27 | |
Vent Length (see “Vent Config.”) | 12 | |
Vent Part Numbers | 11 | |
Vent Requirements | 11 | |
Vertical Vent Termination Requirements | 19 | |
Warnings | 4 | |
Warranty | 34 | |
Water on Glass (see Condensation) | 27 | |
Weight (225 Lbs.) | 6 | |
What Prevents Gas Buildup | 31 | |
What Turns the Main Burners On and Off | 31 | |
Wiring Diagram | 32 | |
Yearly Service Procedure | 29 |
Travis Industries | 9 3 5 0 8 1 1 5 | 4 0 5 0 1 1 3 |