7. Verification Steps

The following steps may be used to verify the configuration of PoE related parameters:

Verify that the PoE Operational Status in ON at the system level by entering the command show power-over-ethernet.

ProCurve Switch 2520-24-PoE# show power-over-ethernet

Status and Counters - System Power Status

Pre-standard Detect : On

Operational Status : On

Usage Threshold (%) : 80

Chassis power-over-ethernet:

Total Available

Power

:

195

W

Total

used Power

:

5

W +/- 6W

Total

Remaining

Power

:

190

W

Verify that Power Enable is Yes at the port level by entering the command show power- management brief.

ProCurve Switch 2520-24-PoE#show power-over-ethernet brief

Status

and Counters - Port

Power

Status

 

 

 

 

PoE

Power

Power

Alloc

Alloc

Actual Configured

Detection

Power

Port

Enable

Priority

By

Power

Power Type

Status

Class

-----

+ -------

---------

-----

------

------ -----------

----------- ------

1

Yes

low

usage

17

W

0.0

W

Delivering

0

2

Yes

low

usage

17

W

0.0

W

Searching

0

3

Yes

low

usage

17

W

0.0

W

Searching

0

4

Yes

low

usage

17

W

0.0

W

Searching

0

5

Yes

low

usage

17

W

0.0

W

Searching

0

6

Yes

low

usage

17

W

0.0

W

Searching

0

7

Yes

low

usage

17

W

0.0

W

Searching

0

8

Yes

low

usage

17

W

0.0

W

Searching

0

9

Yes

low

usage

17

W

0.0

W

Searching

0

10

Yes

low

usage

17

W

0.0

W

Searching

0

11

Yes

low

usage

17

W

0.0

W

Searching

0

12

Yes

low

usage

17

W

0.0

W

Searching

0

TMA; Reviewed:

Solution & Interoperability Test Lab Application Notes

7 of 10

SPOC 11/16/2009

©2009 Avaya Inc. All Rights Reserved.

ProC2520-24PoE

Page 7
Image 7
Avaya 2520-24-POE manual Verification Steps, ProCurve Switch 2520-24-PoE#show power-over-ethernet brief