Bard CH4S1, CH5S1, CH3S1 Wire Routing Instructions, Low Voltage Wiring Connections

Models: CH3S1 CH5S1 CH4S1

1 14
Download 14 pages 10.23 Kb
Page 9
Image 9
Wire Routing Instructions

FIGURE 2

Run wires to terminal block for 460 Volt unit control panel

Run wires to terminal block

Route green ground wire

for 230 Volt unit control panel

to ground lug

Insert wires

through bushing

and attach to

low voltage

terminal block

Control

Panel

Remove

knockout and

insert strain

relief bushing

from opposite

side of panel.

Run wires into

bushing and

close.

Dehumidifier

Wire Routing Instructions

Low Voltage Wiring Connections

 

High Voltage Wiring Connections

 

Orange

NOT USED (TAPE OFF)

230 Volt Single Phase

 

 

230 Volt 3 Phase

 

 

 

 

 

 

 

 

 

Connection

 

 

Connection

 

 

Black/White

 

 

 

 

 

 

 

 

 

 

L1

L2

 

L1

L2

L3

 

To "C"

 

 

 

 

 

 

 

Red/White

 

 

 

Black

 

 

 

Black

To "R"

 

Red

 

Red

 

 

 

 

 

 

 

Purple

 

 

To "L2"

 

 

 

To "L3"

 

 

 

 

 

 

 

 

To "Y1"

Purple/White

 

To "L1"

 

 

To "L1"

 

 

 

460 Volt 3 Phase Connection

 

 

 

 

 

 

 

 

To "DH"

 

240 Volt

 

Black

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

To "L2"

 

 

 

Supply From

 

 

 

 

 

 

 

 

 

 

 

 

 

Step Down Transformer

 

 

To "L1"

 

 

 

(See Wiring Diagram)

 

 

 

 

 

Red

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Terminal Block 64

 

 

 

 

 

 

 

 

 

 

MIS-2454 C

 

 

 

 

 

 

 

Manual

2100-506D

 

 

 

 

 

 

 

Page

9 of 14

Page 9
Image 9
Bard CH4S1, CH5S1, CH3S1 Wire Routing Instructions, Low Voltage Wiring Connections, High Voltage Wiring Connections