Manual Page

FIGURE 3C

W42A2, W42L2, W48A2, W48L2, W60A2, W60L2, W70A2, W70L2

MOUNTING INSTRUCTIONS

10 of

2100

26

-581B

 

 

 

 

 

 

 

 

 

SEAL WITH BEAD

 

 

 

 

 

 

 

 

 

OF CAULKING ALONG

 

 

 

 

 

 

 

 

 

ENTIRE LENGTH OF

 

 

 

A

B

C

D

 

E

TOP.

 

 

 

 

 

REQUIRED DIMENSIONS TO MAINTAIN

30 1/2

10 1/2

6 1/4

1 1/4

 

29 3/4

TOP

1/4" MIN. CLEARANCE FROM

 

 

 

 

 

 

 

COMBUSTIBLE MATERIALS

 

 

 

 

 

 

 

 

REQUIRED DIMENSIONS TO MAINTAIN

32

12

5 1/2

2

 

29

 

RECOMMENDED 1" CLEARANCE FROM

 

 

 

 

 

 

 

COMBUSTIBLE MATERIALS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WALL

D

 

C

A

 

C

 

 

 

HEATER ACCESS

 

 

 

 

 

 

 

 

 

PANEL

 

 

 

Supply Opening

 

B

 

 

 

16"

 

 

 

 

 

 

 

 

 

16"

 

 

 

 

 

E

 

 

 

16"

 

 

 

 

 

 

 

 

 

 

 

 

Return Opening

 

16"

 

 

 

16"

1

 

 

 

 

 

 

 

 

 

6 21 "

30"

 

 

 

 

 

 

16"

1

 

3"

4"

3 81 "

 

7

"

 

 

1"

 

 

8

 

 

 

Typ.

 

 

 

 

 

 

 

 

 

 

 

 

 

2 1 87 "

 

4"

 

 

 

1

"

 

 

 

Typ.

 

6 21 "

2 8

3

 

 

6

21 "

 

 

 

 

 

 

RAIN FLASHING

SUPPLIED

FOAM AIR SEAL

WALL STRUCTURE

1/4" CLEARANCE ON ALL FOUR SIDES OF SUPPLY AIR DUCT IS REQUIRED FROM COMBUSTABLE MATERIALS

SUPPLY AIR

DUCT

RETURN AIR

OPENING

NOTES:

IT IS RECOMMENDED THAT A BEAD OF SILICONE CAULKING BE PLACED BEHIND THE SIDE MOUNTING FLANGES AND UNDER TOP FLASHING AT TIME OF INSTALLATION.

Wall Opening and Hole Location View

Right Side View

 

MIS-416 E

Page 10
Image 10
Bard w17a2 installation instructions W42A2, W42L2, W48A2, W48L2, W60A2, W60L2, W70A2, W70L2