Bard WA423, WA602, WA491 Installation Instructions, Wall Mounting Information, Mounting the Unit

Models: WA423 WA381 WA484 WA491 WA602

1 21
Download 21 pages 18.9 Kb
Page 9
Image 9

INSTALLATION INSTRUCTIONS

WALL MOUNTING INFORMATION

1.Two holes for the supply and return air openings must be cut through the wall as shown in Figure 3.

2.On wood frame walls, the wall construction must be strong and rigid enough to carry the weight of the unit without transmitting any unit vibration.

3.Concrete block walls must be thoroughly inspected to insure that they are capable of carrying the weight of the installed unit.

MOUNTING THE UNIT

1.These units are secured by wall mounting brackets which secure the unit to the outside wall surface at both sides. A bottom mounting bracket is provided for ease of installation, but is not required.

2.The unit itself is suitable for 0 inch clearance, but the supply air duct flange and the first 3 feet of supply air duct require a minimum of 1/4 inch clearance to combustible material. If a combustible wall use a minimum of 30-1/2” x 10-1/2” dimensions for sizing. However it is generally recommended that a 1 inch clearance is used for ease of installation and maintaining the required clearance to combustible material. The supply air opening would then be 32” x 12”. See Figures 3 and 4 for details.

3.Locate and mark lag bolt locations and bottom mounting bracket location. See Figure 3.

WARNING

Failure to provide the 1/4 inch clearance between the supply duct and a combustible surface for the first 3 feet of duct can result in fire causing damage, injury or death.

4.Mount bottom mounting bracket.

5.Hook top rain flashing under back bend of top. Top rain flashing is shipped secured to the right side of the back.

6.Position unit in opening and secure with 5/16 lag bolts; use 7/8 inch diameter flat washers on the lag bolts.

7.Secure rain flashing to wall and caulk across entire length of top. See Figure 3.

8.For additional mounting rigidity, the return air and supply air frames or collars can be drilled and screwed or welded to the structural wall itself (depending upon wall construction). Be sure to observe required clearance if combustible wall.

9.On side by side installations, maintain a minimum of 20 inches clearance on right side to allow access to control panel and heat strips, and to allow proper airflow to the outdoor coil. Additional clearance may be required to meet local or national codes.

Manual 2100-398 Page 7

Page 9
Image 9
Bard WA423, WA602, WA491, WA484, WA381 Installation Instructions, Wall Mounting Information, Mounting the Unit

WA423, WA381, WA484, WA491, WA602 specifications

Bard is a leading manufacturer in the field of air conditioning and heating solutions, known for its innovative products that cater to both residential and commercial needs. Among their notable models are the Bard WA381, WA602, WA484, WA491, and WA423, each designed with specific features and technologies that enhance efficiency, reliability, and user comfort.

The Bard WA381 is a compact unit that excels in energy efficiency and ease of installation. With a focus on high-performance cooling and heating capacities, this model is ideal for areas requiring reliable temperature control in limited spaces. Its advanced engineering ensures low noise operation, making it suitable for quiet environments, such as libraries and offices. The WA381's user-friendly controls and robust construction make it a favored choice among contractors and users alike.

The WA602 model stands out for its dual functionality, providing both cooling and heating. This unit incorporates state-of-the-art heat pump technology, allowing for year-round comfort. With a high Seasonal Energy Efficiency Ratio (SEER) rating, the WA602 combines cost-effective performance with eco-friendly operation. Its durable design and weather-resistant features ensure long-term reliability, even in harsh environments.

Bard's WA484 offers a seamless blend of performance and versatility. This model is equipped with advanced refrigeration technology, providing superior cooling efficiency. The WA484 is designed to accommodate varying load conditions, making it adaptable to numerous applications. Additionally, its intelligent control systems facilitate easy monitoring and adjustments, promoting optimal energy use and user convenience.

The WA491 is engineered with a focus on energy conservation and performance. With a high Energy Efficiency Ratio (EER), this unit minimizes operational costs while delivering exceptional climate control. The WA491's robust construction includes advanced insulation and weatherproofing, ensuring effective performance in diverse conditions. Furthermore, its features include remote monitoring capabilities, allowing users to manage their heating and cooling systems from anywhere.

Lastly, the WA423 is designed for maximum flexibility and efficiency. This model boasts a compact footprint, making it suitable for various installations. With an emphasis on quiet operation, the WA423 is perfect for settings where noise reduction is critical. It is equipped with modern control systems that optimize performance while reducing energy consumption, making it an eco-friendly choice for users.

Collectively, these Bard models reflect a commitment to quality, efficiency, and user satisfaction, setting the benchmark for heating and cooling solutions in the market.