Gas Fryer
Operator’s Manual
Models 718LCG 724CG and 734CG
0606 MN-1141EN Belshaw Bros., Inc 1750 22nd Avenue South
EQUIPMENT RECORD
Seattle, WA 98144-4590 USA Phone 206 322-5474 Fax 206 Toll Free
Cleaning
Contents
Installation
Maintenance
Calculating Correct Water Temperature
Parts Lists
Limited Warranty
Ratios of Plunger Sizes to Donut Weights
Preface
Page
Conforming to Codes
1Installation
FOR YOUR SAFETY
Selecting a Workstation
Assembling the Fryer
Initial Cleaning
Unpacking the Fryer
To avoid electrocuting yourself or
0.5 psig/3.45 kPa when the fryer is connected to the that system
Installing the Fryer
To avoid damaging the fryer, do not
Moving the Fryer
Operation2
Taking Safety Precautions
Frying Donuts
Failure to wait at least one minute for the gas to dissipate could result in a fire or an explosion when the pilot is lighted again
To avoid damaging the machine, do not
operate the conveyor until all the shortening has melted
3Cleaning
Removing the Shortening
Washing
Rinsing
SB-0308 rev
Maintenance4
Use Rev. 3 to correct existing open Kettle Fryer settings
AFFECTS
MN-1141EN
Menu Overview
Figure 2 - Menu Flow Chart
718LCG, 724CG, and 734CG Gas Fryers
718LCG, 724CG, and 734CG Gas Fryers
Open Kettle Fryer Parameter Settings
Default Settings
MN-1141EN
718LCG, 724CG, and 734CG Gas Fryers
setup 0ºF 410ºF 0ºF
MN-1141EN
Table 1 - Parameter Descriptions Set to 375ºF set to “uSEr” after
MN-1141EN
718LCG, 724CG, and 734CG Gas Fryers
Table 2 - Parameter Descriptions Set to “nonE”
718LCG, 724CG, and 734CG Gas Fryers
MN-1141EN
Table 3 - Parameter Descriptions Set to
5Troubleshooting
Page
Step 1 Perform Visual Inspection
Pilot Module
Checkout
Step 2 Review the Normal Operating Sequence
Step 4 Check Safety Shutoff Operation
Step 3 Reset the Module
Main Burner Operation
MN-1141EN
Figure A-1. Normal Operating Sequence
718LCG, 724CG, and 734CG Gas Fryers
START TRIAL FOR IGNITION MAIN BURNER OPERATION
Step 5 Check Normal Operation
Troubleshooting the Ignition System
Troubleshooting-General
Step 1 Check Ignition Cable
Arc Length
Step 3 Check Spark Ignition Circuit
Step 4 Check Pilot and Main Burner Lightoff
What To Do
MN-1141EN
Appearance
Cause
718LCG, 724CG, and 734CG Gas Fryers
B Donut-Making Helps
Tips on Making Quality Cake Donuts
Temperature Conversion
Calculating Correct Water Temperature
Ratios of Plunger Sizes to Donut Weights
Donut Weight per
The parts lists and assembly drawings are
Parts Lists
meant as guides. Because Belshaw
718LCG, 724CG, and 734CG Gas Fryers
718LCG PARTS LIST
MN-1141EN
NUMBER
MN-1141EN
718LCG PARTS LIST CONT’D
718LCG, 724CG, and 734CG Gas Fryers
NUMBER
MN-1141EN
724CG PARTS LIST
GAS VALVE ASSEMBLY
718LCG, 724CG, and 734CG Gas Fryers
718LCG, 724CG, and 734CG Gas Fryers
734CG PARTS LIST
MN-1141EN
718LCG, 724CG, and 734CG Gas Fryers
MN-1141EN
0080A5
718LCG, 724CG, and 734CG Gas Fryers
734FG PARTS LIST
MN-1141EN
Page
US/Canada/Mexico Limited Warranty and Return Policy
Return goods must be
Procedure for Return
Exclusions
Please note the following