BenQ MP730 manual Shutting down the projector, Press I I Power and a confirmation message will

Models: MP730

1 68
Download 68 pages 6.55 Kb
Page 47
Image 47
Shutting down the projector
I￿I￿

Shutting down the projector

1.

Press I￿I￿ Power and a confirmation message will

 

display prompting you.

If you don't respond in a few seconds, the message will disappear.

2. Press Press I￿I￿ Power and a confirmation message will Power a second time. The Power indicator light flashes orange, the projection lamp shuts down, and the fans will continue to run for approximately 90 seconds to cool down the projector.

To protect the lamp, the projector will not respond to any commands during the cooling process.

To shorten the cooling time, you can also activate the Quick cooling function. See "Quick Cooling" on page 53 for details.

3.Once the cooling process finishes, a "Power Off Ring Tone" will be heard. The Power indicator light is a steady orange and fans stop. Disconnect the power cord from the wall socket.

To turn off the power ring tone, see "Turning off the Power on/off ring tone" on page 46 for details.

If the projector is not properly shut down, to protect the lamp, when you attempt to re-start the projector, the fans will run for a few minutes to cool down. Press Power again to start the projector after the fans stop and the Power indicator light turns orange.

Operation 47

Page 47
Image 47
BenQ MP730 manual Shutting down the projector, Press I I Power and a confirmation message will