Bertazzoni H48 6G GGV NE, H48 6G GGV VI, H48 6G GGV CR dimensions Service & Maintenance Instructions

Models: H48 6G GGV CR H48 6G GGV VI H48 6G GGV NE

1 31
Download 31 pages 10.27 Kb
Page 15
Image 15
SERVICE & MAINTENANCE INSTRUCTIONS

SERVICE & MAINTENANCE INSTRUCTIONS

Service and maintenance only to be carried out by an authorised person

To replace parts such as burners, valves and electric components, the appliance must be open removing the worktop. Note: if the valves must be replaced, first disassemble the ignitions switches wires.

It is recommended to replace the valve gaskets each time the valve is replaced, thus ensuring a perfect seal between the body and the gas train.

WARNING: After first installation of the appliance or after any service intervention concerning main gas parts of the appliance, make the leak test using water with soap on the gas connections in order to verify the correct installation. Do not use fire for gas leak testing.

To replace the oven bulb, just unscrew the protection cap that projects out inside the oven. (Fig.19) WARNING:

Disconnect power before servicing unit.

In order to remove the oven door make sure to block the ihinges with a screw driver.

Call an autorised service person for this operation that can be dangerous

15

Page 15
Image 15
Bertazzoni H48 6G GGV NE, H48 6G GGV VI, H48 6G GGV CR dimensions Service & Maintenance Instructions