Best U102E manual Prepare Wall Cabinet, Prepare The Hood

Models: U102E

1 44
Download 44 pages 15.02 Kb
Page 8
Image 8
PREPARE WALL CABINET

PREPARE WALL CABINET

1.Prior to wall cabinet installation, remove doors and door mounting hardware.

2.Cut an opening into the bottom panel to the dimensions shown.

3.Cut out openings for the duct and electrical wiring.

4.Install cabinet on the wall and secure per cabinet manufacturer’s recommendations. The cabinet must be securely fastened to studs and framing behind the drywall prior to hood installation.

Cabinet-

“A”

“B”

Widht

 

 

30”

28-1/2”

15”

 

 

 

36”

34-1/2”

18”

 

 

 

42”

40-1/2”

21”

 

 

 

PREPARE THE HOOD

1.Loosley assemble both mounting brackets to the hood using M4 x 30mm machine screws and flat washers.

2.Place the 8” damper/duct connector on top of the range hood discharge opening. Remove tape from damper flaps.

Secure with (4) 3.9 x 9.5mm screws.

3.Assemble wall spacer to the hood with (3) 3.9 x 9.5mm screws.

NOTE: The spacer is designed to fill a 5/8” gap between the wall and the back of the hood. If the gap is larger, a non-combustible material that is in compliance with local building codes must be used to fill this gap.

MACHINE

MOUNTING SCREWS

(3.9x9.5mm)

SCREWS

 

(M4x30mm)

 

WASHERS

MOUNTING SCREWS (3.9x9.5mm)

WALL

SPACER

- 8 -

Page 8
Image 8
Best U102E manual Prepare Wall Cabinet, Prepare The Hood, Cut an opening into the bottom panel to the dimensions shown