FRADSWITCH-8A, FRADSWITCH-16A, FRADSWITCH-24A
18
This chapter provides mechanical and electrical installation procedures for the Fradswitch.
The Fradswitch is delivered completely assembled. It’s designed to be installed as a desktop unit
or to be mounted in a 19-inch rack.
After installing the unit, refer to Chapter 2 of the Packet Switching Guide for system configuration
information and procedures.

3.1 Unpacking

Perform a preliminary inspection of the equipment container before unpacking the unit.
Evidence of damage should be noted and reported immediately. Unpack the equipment as follows:
1. Place the container on a clean flat surface, cut all straps, and open or remove the top.
2. Take out the Fradswitch carefully and place it securely on a clean surface.
3. Inspect the Fradswitch for damage.

3.2 Site Requirements

Power The Fradswitch should be installed within 5 feet (1.5 m) of an easily accessible grounded
AC outlet capable of furnishing 115- or 230-VAC, in accordance with the nominal supply
power of your Fradswitch.
Data-Channel
Connections The Fradswitch has eight, sixteen, or twenty-four RJ-45 connectors, one for each
asynchronous data channel. Appendix A of the Packet Switching Guide provides pin
allocations.
Main Links
Connections The Fradswitch has three main links connectors. The main links connector depends
on the ordered interface:
• RS-232/V24: 25-pin D-type, female connector
• X.21: 15-pin, female connector
• V.35: 34-pin, female connector
Appendix A in the Packet Switching Guide provides the pin allocations.
Front- and
Rear-Panel
Clearance When the Fradswitch is installed in a 19-inch rack, allow at least 36 inches (90 cm) of
frontal clearance for operator access. Allow at least 4 inches (10 cm) clearance at the
rear of the unit for interface cable connections.
3. Installation