3.0OPERATING INSTRUCTIONS (Continued)
Normal Boiler Operating Cycle
Water Fill Cycle
On the initial filling of the boiler, units equipped with
Firing Cycle
The elements are operated by pressure sensing devices. On initial operation, the boiler should reach 11 psi in approximately 15 minutes. At this point the operating pressure switch will open,
9.0psi, the pressure switch closes, energizing the elements. Condensing Drain, (Optional)
A thermostat is located in the drain assembly and is activated by the temperature of steam. The thermostat operates the cooling solenoid, supplying water to the drain to condense the steam.
Automatic Blowdown Valve, (Optional)
If the unit has an automatic blowdown valve, it is activated when the main power switch is turned “ON”. The boiler will drain when the main power switch is turned "OFF.”
Safety Lockout Conditions
High Temperature Condition, Standard Controls
A high temperature safety device is installed on the boiler. Should the temperature exceed the limit of this device, the boiler will be shut down. As the temperature returns to a safe level, normal boiler operation will resume.
High Temperature Condition,
A high temperature safety device is installed on the boiler. Should the temperature exceed the limit of this device, the boiler will be shut down and switch to a state of lockout. The “Temperature” pilot light (red), and the “Standby” pilot (amber), will come on.
7