3.0OPERATING INSTRUCTIONS
BOILER SECTION
Electrically powered steam generators are available with standard boiler controls or ASME
Start-up Procedure, Standard Controls
1.Turn on water and power supply to appliance.
2.Close the manual blowdown valve if the units is not equipped with the optional automatic blowdown valve.
3.Open door of cabinet and turn on Power Switch. Pilot light will come ON and water will begin to enter boiler. Once water level has reached the proper operating level as indicated on water gauge glass the heating elements will be energized and heat the water. When steam pressure has reached 11 psi the elements will
Start-up Procedure, CSD-1 Controls
1.Turn on water and power supply to appliance.
2.Close the manual blowdown valve if the units is not equipped with the optional automatic blowdown valve.
3.Open cabinet door and turn "ON" power switch. The green pilot light will come "ON.” Water will begin to enter the boiler. When enough water has entered the boiler the (red) “Low Water” pilot will come on for approximately 10 seconds and then the (amber) pilot light will come.
4.Press the “Reset” switch to begin boiler operation. The “Standby” pilot light will go off and the boiler will begin operation. When steam pressure has reached 11 psi the elements will
6