Secure the two handles by tightening the upper wing nuts (carriage bolts must be seated properly into the handle).

Remove the hairpin clips from the handle brackets and remove the carriage bolts and wing nuts from the lower handle. See Figure 3.

Place the bottom holes in lower handle over the pins on handle brackets and secure with hairpin clips.

Insert carriage bolts through upper hole in lower handle from the outside and secure with wing nuts.

Wing Nuts

Carriage Bolt

Hairpin Clip

Figure 3

Loosen the wing nut that secures the rope guide to the right side of upper handle.

Pull the starter rope out of the engine slowly and slip the starter rope into the rope guide. Tighten the wing nut.

Attaching The Hose Assembly

Slide hose adapter of hose assembly into the base adapter located on the left front of the Yard Vacuum. See Figure 4.

Pull spring loaded pin out on the base and align pin with the first hole in the hose adapter.

Release the pin to lock the hose in place.

Connect the hose handle near nozzle end of hose to the side bracket on the upper handle. Refer to Figure 7.

Hose

Adapter

Spring

Loaded Pin

Figure 4

Snap hose handle to the lower handle bracket to secure in place and lay hose tubing on side bracket hanger next to chipper chute. Refer to Figure 7.

ATTACHING THE BAG

Bag Handle

Stud

Straps

Front Tab

Locking Rod

Stud

Figure 5

Grasp bag handle with one hand and slide locking rod on mounting bracket with other hand toward engine. Use the end of mounting bracket as leverage when sliding the locking rod.

See Figure 5.

Slip bag over the rim of the discharge opening and release locking rod to secure bag in place.

Snap bag clip to the top of the lower handle.

Place the lower straps on the bag over the top of lower handle, hooking them on the studs.

NOTE: The bag/chute switch button attached to the mounting bracket must be fully depressed by the tip of front tab on bag handle when securing the bag or engine will not start.

ATTACHING THE BLOWER CHUTE

NOTE: The bag must be removed before installing the blower chute.

Grasp blower chute with one hand and slide locking rod on mounting bracket with other hand toward engine. Use the end of mounting bracket as leverage when sliding the locking rod.

See Figure 6.

Slip blower chute over rim of discharge opening and release locking rod to secure chute in place.

6

Page 6
Image 6
Bolens No. 247.770550 operating instructions Attaching The Hose Assembly, Attaching the BAG, Attaching the Blower Chute