Tools and Materials Needed

TOOLS NEEDED

Hammer

Hob Saw

Adjustabb Wrench

Tape Measu re

Sbt Screwdriver

PhHHpsScrewdriver

%20 Screwdriver

Wire Cutter

Wire Stripper

DrHI _- Z i

Level

MATERIALS NEEDED

(Additional materiab may be required to comply with bcal codes,)

Ebctrbal Supply CaNe - Minimum #14 AWG, 2 conductor, 1 ground, insulated copper conductors rated 75°C or higher,

 

 

_>

Hot Water Supply Line - Minimum

3/8" O,D, copper tubing or metal braided dishwasher

......" *s{_:

....... supply line,

 

 

5

@}s

Shut-off valve and fittings appropriate

for hot water supply line (copper tubing/

 

 

 

compression fitting, or braided hose),

 

 

 

 

90° elbow with 3/8" N,P,T, male threads on one leg, and sized to fit your water supply

<c ......;. ," >

line (copper tubing/compression

fitting,

or braided hose) on the other leg,

 

 

:_;:

Teflon tape or other pipe thread compound to seal plumbing connections,

UL listed conduit connector or strain relief,

2

Page 3
Image 3
Bosch Appliances SHV570, SHE990, SHE660, SHY660, SHX570 installation instructions Tools Needed