![Recommended Piping for Back-up Storage System](/images/new-backgrounds/51829/5182931x1.webp)
Recommended Piping for Back-up Storage System
For hotels, motels, and other high flow applications
(Fig. 5)
Note: The Primary Circulator for the water heating loop must be sized for 21 GPM @ 35 Ft. Head.
16
(Fig. 5)
Note: The Primary Circulator for the water heating loop must be sized for 21 GPM @ 35 Ft. Head.
16