![Step 8: Electrical and supply connections, cont’d.](/images/new-backgrounds/184226/18422615x1.webp)
Express® Crescent® Lavatory System - |
|
Installation Instructions |
Installation Instructions continued . . .
BLACK SUPPLY TUBE |
|
| |
(FROM SPRAYHEAD) |
|
| |
|
| RED SUPPLY TUBE | |
|
| (FROM SPRAYHEAD) | |
SENSOR CIRCUIT |
|
| |
PLUG |
| GREEN SUPPLY TUBE | |
|
| (FROM SPRAYHEAD) | |
|
| COMPRESSION | |
|
| NUT | |
TRANSFORMER |
| RED SPADE | |
CIRCUIT PLUG |
| ||
| TERMINAL | ||
|
| ||
|
| GREEN SPADE | |
|
| TERMINAL | |
SUPPLY INLET | BLACK SPADE | WHITE SPADE | |
TERMINALS | |||
| |||
| TERMINAL |
| |
VERNATHERM™ |
|
| |
THERMOSTATIC |
|
| |
MIXING VALVE |
|
| |
Figure 6b |
|
|
Installation Instructions continued . . .
Step 8: Electrical and supply connections, cont’d.
6.Check the temperature when approximately 1.0 GPM water flow is reached and adjust if necessary (the range of the valve is
•Loosen temperature locking nut with wrench.
•Using a blade screwdriver, turn the adjustment stem counterclockwise to increase the temperature or clockwise to decrease the temperature (see Figure 7).
•Once desired temperature is reached, tighten nut to prevent temperature change.
TEMPERATURE
ADJUSTMENT
STEM
TEMPERATURE
LOCKING
NUT
Figure 7
8 | 2/8/07 | Bradley Corporation • |