Braun Corporation FMVSS No. 403 Quick Reference Installation Sheet 32494

Lift Operating Instructions

 

 

 

 

To Load Passenger (continued):

 

 

 

 

 

R

 

Q

 

 

 

 

 

 

3. Unlock wheelchair brakes and load

 

 

 

 

 

 

 

passenger from platform into ve-

 

 

 

 

 

 

 

hicle. Note: Lower head to clear

 

 

 

 

 

 

 

door jamb header.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

Release Valve

Note: Close backup pump release valve securely before operating electric pump.

approximate

1/16” intervals

maximum

Valve Tightening

30 inch lbs

Specification:

minimum

Once valve seats

15 inch lbs

(stops), tighten 15

seats

to 30 inch pounds

as shown.

(stops)

 

N

C

L

O

E

P

S

O

E

 

Release Valve

 

 

 

 

 

To Fold Platform (In):

 

 

 

 

 

 

 

 

 

Press FOLD (orange IN) switch

 

 

 

 

 

 

 

 

until platform stops (fully folded).

 

 

 

 

 

 

 

 

Release switch.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

S

 

 

 

 

 

 

 

 

 

 

 

 

 

 

T

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

To Close Door(s):

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Automatic Door Operator(s):

 

 

 

 

 

 

U

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Press yellow CLOSE switch until

 

 

 

 

 

door(s) are fully closed. Release

 

 

 

 

 

switch.

Manual Door(s):

Manually close door(s) fully.

Manual Operating Instructions

If you experience power or equip-

differ from standard lift operation

Lift Operating Instructions for all

ment failure, refer to the Manual

procedures. Manual Instructions

normal lift operation procedures

Operating Instructions to operate

Decal 31894 (posted on pump

(such as loading and unloading

the lift. Instructions and photos

cover) provides manual operat-

passengers). Follow all Lift

are provided for all steps that

ing instructions also. Refer to the

Operation Safety Precautions!

 

 

 

Open

Close

(Down)

 

(Up/Stop)

B

To Unfold Platform (Out):

Using hand pump handle:

a. Place slotted end of pump handle onto back-up pump release valve and turn counterclockwise (open — 1/2 turn only) until the platform reaches floor level (fully unfolded). See Photo B.

b. Turn the release valve clockwise (close) to stop the platform. See Photo B.

Note: Valve must be tight, but do not overtighten.

DOWN (To Lower Platform and Unfold

Outer Barrier):

Place slotted end of pump handle onto back-up pump release valve and turn counterclockwise (open — 1/2 turn only) until the platform reaches ground level and/or outer barrier unfolds. See Photo B.

C

UP (To Fold Outer Barrier and

Raise Platform):

Using hand pump handle:

a. Place slotted end of pump handle onto back-up pump release valve and turn clockwise to close secure- ly. See Photo B.

Note: Valve must be tight, but do not overtighten.

b. Insert handle into back-up pump and stroke until platform reaches floor level (see Photo C).

To Fold Platform (In):

Insert handle into back-up pump and stroke until platform stops (folds fully). See Photo C.

Note: Close back-up pump release valve securely before operating elec- tric pump.

Page 6
Image 6
Braun 403 dimensions Manual Operating Instructions