Braun NL Series manual Cycles

Models: NL Series

1 53
Download 53 pages 30.05 Kb
Page 50
Image 50

Maintenance and Lubrication Schedule

continued

Perform all procedures listed in previous section also

4500

Cycles

Inspect parallel arms, bushings and pivot pins for visible wear or damage

Inspect parallel arm pivot pin mounting bolts (8)

Inspect platform pivot pin, bushings and vertical arms for wear, damage and positive securement

Inspect upper/lower fold arms, rotating pivot slide arms, slide support arms and associated pivot pins, bushings, and bearings for visible wear or damage

Replace if needed.

Tighten or replace if needed.

Replace defective parts and resecure as needed. Apply Light Grease during reassembly proce- dures.

Replace if needed.

Inspect gas springs (cylinders) for wear or damage, proper operation and positive securement

Inspect rotating pivot slide arm UHMW slide bear- ings (buttons)

Tighten, replace or correct as needed

Apply Door-Ease or replace if needed. See Lubri- cation Diagram.

Inspect vertical arm plastic covers

Resecure or replace if needed.

Inspect power cable

Resecure, repair or replace if needed.

Page 48

Page 50
Image 50
Braun NL Series manual Cycles