3A | 3B | 3/8” |
| ||
| 3/8” 7/16” | 7/16” |
|
| |
| 1 |
|
1
2
66 | ReproductionFR | |||
(7.6 Nm) |
| for | 2 | |
|
|
|
| 66 |
| Not |
|
| (7.6 Nm) |
|
|
|
| 3 |
|
| 3A |
| |
|
| EN |
|
|
|
| 1 | Align slot in chute ring with arrow on mounting ring. | |
|
| 2 | Install fasteners and tighten securely, but do not overtighten. | |
|
| 3 | Install cable ties as shown. |
|
3 |
| 1 | Alignez la fente dans l’anneau de l’éjecteur sur la flèche de l’anneau de | |
|
|
| montage. |
|
|
| 2 | Installez les fixations et serrez fermement, mais sans excès. | |
|
| 3 | Installez les attaches de câble comme illustré. | |
|
| 3B |
| |
|
| EN |
|
|
|
| 1 | Align slot in chute ring with arrow on mounting ring. | |
|
| 2 | Install fasteners and tighten securely, but do not overtighten. | |
|
| 3 | Connect wire harness. |
|
|
| FR |
|
|
|
| 1 | Alignez la fente dans l’anneau de l’éjecteur sur la flèche de l’anneau de | |
|
|
| montage. |
|
|
| 2 | Installez les fixations et serrez fermement, mais sans excès. | |
|
| 3 | Raccordez le faisceau de câbles. |
4