Burner |
|
Mixer Tube | Burner Assembly |
| |
Burner Mixer |
|
Tube Head |
|
Brass
Extension Air Opening Hitch Pin
Tube
Lava Rocks
15" Lava Rock Grate
Square Nuts
Screw
Screw
STEP 5:
a.Turn burner assembly over in base pan. Insert the end of brass extension tube (that extends inside the base pan) into the head of burner mixer tube.
b.Position burner assembly in center of base pan and push tab on bottom of burner bracket through slot in bottom of base pan.
c.Install the hitch pin through the hole in the tab on the underside of base pan. This will hold the burner assembly in place.
IMPORTANT: The burner mixer tube head must remain sleeved over the brass extension tube. Visually inspect the installation by looking into the air opening on the side of the burner mixer tube head. When properly installed, the end of the brass extension tube can be seen inside the mixer tube.
NOTE: The air opening in the mixer tube head must not be obstructed in any manner. Check periodically and clean grease and other substances from burner mixer tube head to allow proper airflow.
STEP 6:
a.Insert a
b.Insert a
c.Place the 15" lava rock grate inside of base pan on the three
d.Place an even layer of lava rocks over entire surface of grate. Position rocks closely together so there are no large gaps between rocks.
NOTE: To convert this unit to a gas grill, simply place a 152" chrome cooking grill on top of the
6