INSTALL SUPPORT SYSTEM
1.At hood location, install 2 x 4 cross framing between ceiling joists using dimensions shown.
2.Finish the ceiling surface. Be sure to mark the location of the ceiling joists and cross framing.
3.Position the support frame as shown. The UP ARROW should point towards the ceiling after installation.
4.Secure the support frame to joists and cross framing with four screws provided (6x70mm) and four washers (D. 6.4mm). Make sure screws are driven into center of joists and framing for maximum strength.
5.Adjust the overall height of the support frame. Loosen and
Note that the hood height is
DRYWALL | CROSS FRAMING |
913/16”
CEILING
JOISTS
WASHERS (Ø6.4mm)
MOUNTING SCREWS (6x70mm)
SUPPORT
FRAME
FRONT
HEIGHT ADJUSTMENT
SLOTS
TOP VIEW OF SUPPORT FRAME
107/8” (276mm)
713/16”
(198mm)
CONNECT DECORATIVE FLUE
1.Secure the upper flue to the upper support frame with the mounting screws (3,9x9,5mm).
2.Insert the lower flue moving it completely towards the top and fix it temporarily with retaining screw (3.9x9.5mm).
INSERT THE LOWER
FLUE
RETAINING SCREW
MOUNTING SCREWS
(3.9X9.5MM)
UPPER FLUE
LOWER
FLUE
- 7 -