3. INSTALLATION
3.1INSPECT THE CONTENTS OF THE BOX
•Inspect the exterior of the unit for shipping damage. Ensure that there is no damage to the door, door latches, power cord, etc.
•Remove and discard the 2 transport brackets (A) and open the door. Discard the styrofoam fillers (ERV units only) and remove the hardware kit from the unit. Inspect the interior of the unit for damage. Ensure that heat or energy recovery core, core filters, insulation, dampers, etc. are all intact.
A |
VD0183 |
3.2LOCATING THE UNIT
Choose an appropriate location for the unit.
•Within an area of the house where the ambient temperature is between 10°C (50°F) and 65°C (149°F) (basement, furnace room, closet, etc.).
•So as to provide easy access to the interior of the unit, for maintenance.
•Close to an exterior wall, so as to limit the length of the insulated flexible duct to and from the unit.
•Away from hot chimneys and other fire hazards.
•Allow for a power source (standard
•For HRV units ONLY: Close to a drain. If no drain is close by, use a pail to collect
3.3UNIT PREPARATION
Both HRV and ERV units are equipped with 2 ports having integrated balancing damper. Turn the thumb screw (A) clockwise to manually open and adjust the damper (B).
HRV UNITS: Set the Fresh air to building port to wide open position, and adjust the Exhaust air to outside port to 3rd notch.
NOTE: If the unit needs to be balanced, adjust the damper of the Exhaust air to outside port to wide open position. See Section 7.
ERV UNITS: Set both Fresh air to building port and Exhaust air to outside port to wide open position.
A
B
VJ0032
Port with integrated balancing
damper - Top view
The door latches location can be changed from sides to front of the unit, according to the installation needs.
VD0176 |
Latches on sides of the unit | Latches in front of the unit |
To do so, turn the unit upside down. Open the latches and unscrew them from the unit. Install the latches on their new locations.
VO0089
VO0090
VO0094
- 9 -