Installation, Start--Up Operating andService and Maintenance InstructionsSeries E/F

310AAV/JAV

SINGLE--STAGE DELUXE, INDUCED--COMBUSTION

4--WAY MULTIPOISE GAS FURNACE

SAFETYCONSIDERATIONS 2........................
INTRODUCTION 3..................................
CODESAND STANDARDS 4..........................
Safety 4.........................................
GeneralIn stallation 4...............................
Combustion and Ventilation Air 4.....................
Duct Systems 5...................................
AcousticalLiningand Fibrous Glass Duct 5.............
GasPip ing and Gas Pipe Pressure Testing 5.............
ElectricalC onnections 5............................
Venting 5........................................
LOCATION 5.......................................
AIRFOR COMBUSTION AND VENTILATION 7.........
INSTALLATION 10..................................
Bottom Return Air Inlet 1 0..........................
SideReturn Air Inlet 10.............................
Leveling Legs (If Desired) 11........................
Bottom Return Air Inlet 1 2..........................
SuspendedFurnace Support 12.......................
PlatformFurnaceSupport 12.........................
Roll--OutProtection 12.............................
Bottom Return Air Inlet 1 2..........................
SideReturn Air Inlet 12.............................
GeneralRequirements 13............................
Ductwork Acoustical Treatment 13....................
SupplyAir Connections 13..........................
ReturnAir Connections 19..........................
115--VWiring 21..................................
J--boxRelocation 21...............................
ElectricalC onnection to J--Box 21.....................
PowerCord Installationin Furnace J--Box 22............
BXCable Installationin Furnace J--Box 22..............
24--VWiring 24...................................
Accessories 24....................................
GeneralVentingRequirements 24.....................
MasonryChimney Requirements 25...................
ApplianceApplicationRequirements 27................
Sidewall Venting 27................................
START--UP, ADJUSTMENT,AND SAFETY CHECK 32.....
General 32.......................................
Start--UpProcedures 32.............................
Adjustments 37...................................
CheckSafety Controls 37...........................
Checklist 38......................................
SERVICEAND MAINTENANCE PROCEDURES 43.......
Introduction 43...................................
Carean d Maintenance 44...........................
Sequenceof Operation 47...........................
WiringD iagrams 48...............................
Troubleshooting 48................................
Accessory listing 51
................................
PARTSREPLACEMENT INFORMATIONGUIDE 52.......
D
E
S
I
G
N
C
E
R
T
I
F
I
E
D
REGISTERED
ISO 9001:2000
Always Ask For
Use of the AHRI Certified TM Mark indicates a
manufacturer’s participation in the program. For
verification of certification for individual products,
go to www.ahridirectory.org.
NOTE: Read the entire instruction manual before starting the
installation.
Portionsof the text and tables are reprintedfrom NFPA 54/ANSI
Z223.1--2009E, with permission of Nation Fire Protection
Association,Quincy, MA 02269 and AmericanGas Association,
Washington DC 20001. This reprinted material is not the
complete and official position of the NFPA or ANSI on the
referencedsubject, which is representedonly by the standard in
itsen tirely.