Contents
Main
installation, start-up, and operating instructions
4-WAY MULTIPOISE FIXED-CAPACITY DIRECT-VENT CONDENSING GAS FURNACE
340MAV Series D
Fig. 2Dimensional Drawing
DIMENSIONS (IN.)
For airflow requirements above 1800 CFM, use both side inlets, a
4.
3.
11030
03001
10030
0
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
TABLE 1OPENING DIMENSIONS (IN.)
Fig. 13Floor and Plenum Opening Dimensions
Fig. 14Furnace, Plenum, and Subbase Installed on a Combustible Floor
Fig. 15Furnace, Plenum, and Coil Assembly or Coil Box Installed on a Combustible Floor
Page
Page
Page
Page
Fig. 24Wiring Diagram
NOTE #4
10. BLOWER-OFF DELAY, GAS HEATING 90, 135, 180 OR 225 SECONDS, COOLING OR
9. BLOWER-ON DELAY, GAS HEATING 60 SECONDS, COOLING OR HEAT PUMP 2 SECONDS.
PCB
HI/LO RELAY
LEGEND
SCHEMATIC DIAGRAM (NATURAL GAS & PROPANE)
C
Fig. 25Control Center
TABLE 4ELECTRICAL DATA
Page
Page
Page
TABLE 6MAXIMUM ALLOWABLE PIPE LENGTH (FT)
TABLE 6MAXIMUM ALLOWABLE PIPE LENGTH (FT) Continued
Page
Page
Fig. 33Sidewall Termination of 12 in. or More
Fig. 30Roof Termination (Preferred)
Fig. 34Sidewall Termination of Less than 12 in.
VENT
Fig. 31Concentric Vent and Combustion-Air Roof Termination (Preferred)
Page
Page
Page
Page
Page
Page
TABLE 8MODEL 340MAV ORIFICE SIZE AND MANIFOLD PRESSURE FOR CORRECT INPUT
Page
TABLE 8MODEL 340MAV ORIFICE SIZE AND MANIFOLD PRESSURE FOR CORRECT INPUT Continued
Page
Page
DERATE DERATE MULTIPLIER
EXAMPLE: 100,000 Btuh input furnace installed at 4300 ft.
Furnace Input Rate at Sea Level XDerate
Multiplier Factor =Furnace Input Rate
at Installation Altitude 100,000 X 0.91 = 91,000
e. Refer to Table 11 for cu ft of gas per hr.
Page
CHECKLISTINSTALLATION
Page
SERVICE TRAINING