ELECTRICAL REQUIREMENTS
Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.
WARNING - The brewer must be disconnected from the power source until specified.
WARNING - The power cord must be UL Listed, Flexible Cord Type SO, SJO, SJTO, HSJO or SJOW, Rated 90° C, and the attachment plug cap must be UL Listed, in order to avoid a hazard. The Power Supply Cord must be at least 3 feet long and maximum 6 feet long (measured from Strain Relief to end of the Attachment Plug Cap).
L2 RED | L2 RED |
| L2 |
WHITE | NEUTRAL WHITE |
NEUTRAL | N |
| |
L1 BLACK | L1 BLACK L1 |
GREEN
G
POWER CORD
WHITE | NEUTRAL WHITE |
NEUTRAL | N |
| |
L1 BLACK | L1 BLACK L1 |
|
GREEN
G
POWER CORD
| 120V 2 WIRE + GROUND |
DUAL VOLT
TOGGLE SWITCH
L2 RED | L2 RED | POWER CORD |
| L2 |
|
L1 BLACK | L1 BLACK L1 |
|
|
| |
|
| GREEN |
| G |
|
240V 2 WIRE + GROUND | ||
L2 RED | NEUTRAL BLUE | POWER CORD |
| N |
|
L1 BLACK | L1 BROWN L1 |
|
|
|
GREEN/YELLOW
G
230V 2 WIRE + GROUND
ELECTRICAL HOOK-UP (All Models)
1.An electrician must provide electrical service.
2.Determine the available
3.(DV models only) Select the desired unit voltage based on the available
4.Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
5.Remove the front access panel to gain access to the terminal block.
6.Feed the power cord through the strain relief and connect it to the terminal block(s).
7.Connect the power cord to the terminal block as shown.
8.Before proceeding, verify the voltage at the field wiring terminal block.
9.(DV models only) Set voltage switch to the appropriate position and replace the access panel.
10.If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing has been hooked up, the brewer is ready for Initial
Page 5 | 41581 120408 |
|