Bunn JDF-4S service manual Priming, Operating Controls, Refrigeration Switch

Models: JDF-4S

1 28
Download 28 pages 48.61 Kb
Page 8
Image 8
PRIMING

PRIMING

1.Open the dispenser door

2.Load concentrate per instructions in section titled Loading.

3.Close the dispenser door.

4.Place a large container under the appropriate dispense nozzle.

Press and hold the “Product Dispense Switch” Fig 5, until concentrate dispenses from the dispense nozzle. Note: This may take several seconds, depending on the installation and set pump speed.

OPERATING CONTROLS

Refrigeration Switch

The refrigeration switch is located on the Electrical Panel of the dispenser near the Circuit Board. This switch controls power to the water bath pump and relay contacts for the compressor and condenser fan motor.

FIG 7 Refrigeration Switch - JDF-2S

FIG 8 Refrigeration Switch - JDF-4S

Product Dispense Switch (Mechanical Switch Machines)

Pressing and holding switch will initiate product flow from the respective nozzle; releasing the switch will stop the flow.

 

P3583

P3844

FIG 9 Product Dispense Switches - JDF-2S

FIG 10 Product Dispense Switches - JDF-4S

 

8

44744 032811

 

Page 8
Image 8
Bunn JDF-4S Priming, Operating Controls, Refrigeration Switch, Product Dispense Switch Mechanical Switch Machines