Bunn service manual QUICK SETUP GUIDE - JDF-2S and JDF-4S JDF-2S shown, Plumbing Requirements

Models: JDF-4S

1 28
Download 28 pages 48.61 Kb
Page 28
Image 28
QUICK SETUP GUIDE - JDF-2S and JDF-4S (JDF-2S shown)

QUICK SETUP GUIDE - JDF-2S and JDF-4S (JDF-2S shown)

P3577

 

 

1. Install door cover by first plugging the

 

 

door harness connector into the machine

 

 

harness connector located at the bottom

2. Install door cover.

P3578

of the machine door.

 

 

 

4. Place refrigeration switch in the OFF po-

5. Connect water supply to machine. (See

sition.

Plumbing Requirements)

P3582

 

7. Install bath tank fill tube over a nozzle as

8. Place the program switch in the ON po-

shown.(See Initial Fill)

sition.

10. Place the refrigeration switch in the 11. Insert juice containers as shown.P3591 ON position and the program switch in the

OFF position.

P3579

3. Secure the door cover using 5 screws provided.

P3588

6.Connect power supply to machine. (See Electrical Requirements)

P3589

9.Hold the dispense switch until water be- gins to flow into the tank (approx. 10 sec- onds). When tank is full, water will begin pour out of the overflow tube, Press the dispense button to stop the flow of water.

12.Proceed to page 7 in the Operating and Installation manual for calibration instruc- tions and charts.

28

44744 032811

 

Page 28
Image 28
Bunn service manual QUICK SETUP GUIDE - JDF-2S and JDF-4S JDF-2S shown, Plumbing Requirements, shown.See Initial Fill