SERVICE (cont.) | 6. | Check the iced tea solenoid valve for coil action. | ||
BREW SOLENOID VALVE (ICED TEA) | ||||
| Connect the brewer to the power source. With TEA/ | |||
|
|
| ||
|
|
| OFF/COFFEE switch in the "TEA" position press | |
|
|
| the start switch and listen carefully in the vicinity | |
|
|
| of the solenoid valve for a "clicking" sound as the | |
|
|
| coil magnet attracts. | |
|
| 7. | Disconnect the brewer from the power source. | |
|
| If the sound is heard as described and water will not | ||
|
| pass through the solenoid valve, there may be a block- | ||
|
| age in the water line before the solenoid valve or, the | ||
|
| solenoid valve may require inspection for wear, and | ||
|
| removal of waterborne particles. | ||
|
| If the sound is not heard as described, replace the | ||
|
| solenoid valve. | ||
|
| Removal and Replacement: | ||
|
| 1. | Remove all wires from solenoid valves. | |
| P1960.60 | 2. | Turn off the water supply to the brewer. | |
| FIG. 4 ICED TEA BREW SOLENOID VALVE | 3. | Disconnect the water lines to and from the sole- | |
Location: |
| noid valves. | ||
| Viewing the brewer from the rear the iced tea brew | 4. | Remove the two | |
solenoid valve is mounted in the center of the mount- |
| mounting bracket to the brewer base. | ||
ing bracket. | 5. | Lift out the bracket. | ||
|
| 6. | Remove the two | |
Test Procedures: |
| ing the iced tea brew solenoid valve to the mount- | ||
1. Disconnect the brewer from the power source. |
| ing bracket. | ||
2. Disconnect the white/blue and white wires from | 7. | Securely install the new iced tea brew solenoid | ||
| the iced tea brew and dilution solenoid valves. With |
| valve to the mounting bracket. | |
| the TEA/OFF/COFFEE switch in the "TEA" position | 8. | Attach the mounting bracket to the brewer base. | |
| press the start switch. | 9. | Securely fasten the water lines to and from the | |
3. | With a voltmeter, check the voltage across the |
| solenoid valves. | |
| white/blue and white wires. Connect the brewer | 10. | Refer to Fig. 5 when reconnecting the wires. | |
| to the power source. The indication must be 120 |
|
| |
| volts ac. |
|
| |
4. Disconnect the brewer from the power source. |
| WHI to Main | ||
|
|
| ||
|
|
| Harness |
If voltage is present as described, proceed to #5.
If voltage is not present as described, refer to the Wir- ing Diagram and check brewer wiring harness.
5. Check for continuity across the iced tea brew so- | WHI/RED |
|
| |
to Switch HOT COFFEE |
|
| ||
lenoid valve coil terminals. | BREW SOLENOID |
|
| |
|
|
| ||
If continuity is present as described, reconnect the | WHI/BLU | ICED TEA BREW |
| |
SOLENOID |
| |||
|
|
| ||
white/blue and white wires to the solenoid. | to Switch | DILUTION |
| |
SOLENOID |
| |||
If continuity is not present as described, replace the |
|
| P1364 | |
solenoid valve. | FIG.5 SOLENOID VALVE TERMINALS | |||
| ||||
Page 17 |
| 29466 | 082200 | |
|
|
|