Bunn twf-ez service manual Brew Solenoid Valve Iced Tea, SERVICE cont

Models: twf-ez

1 26
Download 26 pages 30.25 Kb
Page 17
Image 17
BREW SOLENOID VALVE (ICED TEA)

SERVICE (cont.)

6.

Check the iced tea solenoid valve for coil action.

BREW SOLENOID VALVE (ICED TEA)

 

Connect the brewer to the power source. With TEA/

 

 

 

 

 

 

OFF/COFFEE switch in the "TEA" position press

 

 

 

the start switch and listen carefully in the vicinity

 

 

 

of the solenoid valve for a "clicking" sound as the

 

 

 

coil magnet attracts.

 

 

7.

Disconnect the brewer from the power source.

 

 

If the sound is heard as described and water will not

 

 

pass through the solenoid valve, there may be a block-

 

 

age in the water line before the solenoid valve or, the

 

 

solenoid valve may require inspection for wear, and

 

 

removal of waterborne particles.

 

 

If the sound is not heard as described, replace the

 

 

solenoid valve.

 

 

Removal and Replacement:

 

 

1.

Remove all wires from solenoid valves.

 

P1960.60

2.

Turn off the water supply to the brewer.

 

FIG. 4 ICED TEA BREW SOLENOID VALVE

3.

Disconnect the water lines to and from the sole-

Location:

 

noid valves.

 

Viewing the brewer from the rear the iced tea brew

4.

Remove the two #8-32 keps nuts holding the

solenoid valve is mounted in the center of the mount-

 

mounting bracket to the brewer base.

ing bracket.

5.

Lift out the bracket.

 

 

6.

Remove the two #10-32 slotted-head screws hold-

Test Procedures:

 

ing the iced tea brew solenoid valve to the mount-

1. Disconnect the brewer from the power source.

 

ing bracket.

2. Disconnect the white/blue and white wires from

7.

Securely install the new iced tea brew solenoid

 

the iced tea brew and dilution solenoid valves. With

 

valve to the mounting bracket.

 

the TEA/OFF/COFFEE switch in the "TEA" position

8.

Attach the mounting bracket to the brewer base.

 

press the start switch.

9.

Securely fasten the water lines to and from the

3.

With a voltmeter, check the voltage across the

 

solenoid valves.

 

white/blue and white wires. Connect the brewer

10.

Refer to Fig. 5 when reconnecting the wires.

 

to the power source. The indication must be 120

 

 

 

volts ac.

 

 

4. Disconnect the brewer from the power source.

 

WHI to Main

 

 

 

 

 

 

Harness

If voltage is present as described, proceed to #5.

If voltage is not present as described, refer to the Wir- ing Diagram and check brewer wiring harness.

5. Check for continuity across the iced tea brew so-

WHI/RED

 

 

to Switch HOT COFFEE

 

 

lenoid valve coil terminals.

BREW SOLENOID

 

 

 

 

 

If continuity is present as described, reconnect the

WHI/BLU

ICED TEA BREW

 

SOLENOID

 

 

 

 

white/blue and white wires to the solenoid.

to Switch

DILUTION

 

SOLENOID

 

If continuity is not present as described, replace the

 

 

P1364

solenoid valve.

FIG.5 SOLENOID VALVE TERMINALS

 

Page 17

 

29466

082200

 

 

 

Page 17
Image 17
Bunn twf-ez service manual Brew Solenoid Valve Iced Tea, SERVICE cont