Bunn WDG-2 manual Motor

Models: WDG-2

1 28
Download 28 pages 9.19 Kb
Page 17
Image 17

SERVICE (cont.)

Motor (cont.)

Test Procedure:

1.Disconnect grinder from the power supply.

2.Remove upper front inspection panel.

3.Remove the two 1/4"-20 screws (A) holding the front cover (B).

4.Remove load disc (C) from burr auger rotor/as- sembly (D).

5.Remove burr auger rotor/spring assembly

(D)from the burr housing (H).

6.Remove rear panel.

7.Disconnect the red, black and blue wires from the left or right motor to the motor circuit as- sembly (1).

8.(A) Left Motor - Disconnect blue wire on

the left motor from the blue wire to the hopper selector switch.

(B)Right Motor- Disconnect the blue wire on the right motor from the white/blue wire to the hopper selector switch.

9.Connect leads of an ohm meter to the blue wires from the left or right motor. Check for continuity.

If continuity is present the motor overload is good. If continuity is not present press the red "RESET" but- ton. Listen carefully for a "click". This resets the mo- tor overload. Recheck for continuity. If continuity is now present the motor overload is reset. If motor over- load does not reset replace motor.

10.Set an ohm meter to read at least 10 ohms. Connect leads from ohm meter to the black and red wires from the left or right motor.

The ohm reading should be approximately 10 ohms. Rotate the motor shaft approxi - mately 1/8 turn through one full rotation. If ohm readings are consistent motor wind -

ings are good. If reading vary more than

± 1 ohm, replace motor.

Removal and Replacement:

1.Disconnect red, black and blue wires from the

motor to be removed from the motor circuit as- sembly (1).

2Loosen the two #10-32 slotted head screws (2)

attaching motor circuit assembly (1) to motor mounting bracket (5).

3.Remove motor circuit assembly (1) with wires from harness and the opposite motor connected.

4.Right Motor - Disconnect blue wire on motor from blue wire on hopper selector switch (4). Left Motor - Disconnect blue wire on motor from white/blue wire on hopper selector switch (4).

5.Using a 7/16" socket, extension and rachet re- move two 1/4"-20 hex head capscrews and lockwashers (3) attaching front of motor to front of mounting bracket (5).

6.Remove two #10-32 slotted hex head screws (2).

7.Lift motor out of mounting bracket (5) and re- move through the rear of grinder with hopper collar and discharge chute assembly attached.

8.Remove four #10-24 slotted hex head screws attaching discharge chute to motor. Remove dis- charge chute. Set discharge chute and screws aside for reassembly.

9.On new motor assembly with hopper collar in- stall discharge chute assembly using four #10- 24 slotted hex head screws.

10.Mount new motor, hopper collar and discharge chute assembly on mounting bracket using two 1/4"-20 hex head capscrews and lockwashers

(3)and two #10-32 slotted hex head screws (2) and one external tooth lockwasher.

11.Install motor circuit assembly (1) between head of the two #10-32 slotted hex head screws (2) and external tooth lockwashers. Tighten screws

(2).

12.Refer to wiring diagram (pages 24 & 25) and connect wires from motor to motor circuit as- sembly (1) and hopper selector switch (4).

17

10854 030300

 

Page 17
Image 17
Bunn WDG-2 manual Motor