Burnham 81441001R8-3/06 installation instructions Do Not Pressure Test With Air

Models: 81441001R8-3/06

1 16
Download 16 pages 6.21 Kb
Page 11
Image 11
DO NOT PRESSURE TEST WITH AIR.

Stand Assemblies upright, place in position and fasten to the walls with Top Center Supports using the number shown in the table above. Insert Top Center Supports in Air Outlet opening of Sections opposite studs (stud locations determined in step 1). Use wood screw furnished with Top Center Support and screw into stud until tight, the longer dimension of the top center support is in a vertical position when installed. Back off fraction of a turn to permit movement caused by expansion and contractions of sections. Adjust Bottom Center Supports by turning Cap Screws down until they begin to contact Àoor. Do not extend the Cap Screws any further.

Connect assemblies to piping. Complete remainder of piping to boiler, ¿ll system with water and check for leaks.

CAREMUSTBEEXERCISEDTOSEETHAT30PSIGAUGE PRESSURE IS NOT EXCEEDED.

DO NOT PRESSURE TEST WITH AIR.

7.Installation ofValve enclosures (furnished in right-hand and left-hand patterns).

Remove knockout in end of Valve Enclosure if piping to run through Valve Enclosure.

Bend tab on Valve Enclosure so that hole is on inside of Valve Enclosure facing wall.

Place Valve Enclosure next to BASE-RAY®and fasten to BASE-RAY with ¼” thumb screw furnished.

Insert screw furnished through tab on Valve Enclosure and fasten to wall. Set Valve Enclosure Cover in place.

11

Page 11
Image 11
Burnham 81441001R8-3/06 installation instructions Do Not Pressure Test With Air