Stand Assemblies upright, place in position and fasten to the walls with Top Center Supports using the number shown in the table above. Insert Top Center Supports in Air Outlet opening of Sections opposite studs (stud locations determined in step 1). Use wood screw furnished with Top Center Support and screw into stud until tight, the longer dimension of the top center support is in a vertical position when installed. Back off fraction of a turn to permit movement caused by expansion and contractions of sections. Adjust Bottom Center Supports by turning Cap Screws down until they begin to contact Àoor. Do not extend the Cap Screws any further.
Connect assemblies to piping. Complete remainder of piping to boiler, ¿ll system with water and check for leaks.
CAREMUSTBEEXERCISEDTOSEETHAT30PSIGAUGE PRESSURE IS NOT EXCEEDED.
DO NOT PRESSURE TEST WITH AIR.
7.Installation ofValve enclosures (furnished in
Remove knockout in end of Valve Enclosure if piping to run through Valve Enclosure.
Bend tab on Valve Enclosure so that hole is on inside of Valve Enclosure facing wall.
Place Valve Enclosure next to
Insert screw furnished through tab on Valve Enclosure and fasten to wall. Set Valve Enclosure Cover in place.
11