SPECIAL APPLICATIONS
BASE-RAY®INSTALLEDONTHREEWALLSOFROOM
–When BASE-RAY is installed on three walls, expansion noises are sometimes created by the middle assembly when rigid piping is used to connect all three assemblies together. Flexibility can be gained by connecting two of the adjoining assemblies with a Àexible connector or swing joint such as illustrated.
INSTALLATION WITH BURNHAM RADIANT OR SLENDERIZED RADIATORS – Since a BASE-RAY installation is made in much the same manner as any other radiator system, BURNHAM RADIANT OR SLENDER- IZED RADIATORS may be used in a BASE-RAY Radiant Baseboard System.
TWO-TIER INSTALLATION –Where wall space is limited, BASE-RAY may be installed in tiers. Both sections may be upright or lower section inverted as illustrated. Legs on end sections are cut off to enhance appearance.
RATING CORRECTION FACTOR – If BASE-RAY is installed in tiers in accordance with the illustrations, each tier will have a rating of .91 times the rating shown in the Tables on pages 2 and 3.
POSSIBLE PIPING ARRANGEMENTS
TWO-TIER BASE-RAY FORCED CIRCULATION HOT WATER SYSTEMS