39
xI Start-up and Checkout
Usethefollowingprocedureforinitialstart-upoftheboiler:
1) Ifnotalreadydone,ushthesystemtoremovesediment,ux,andtracesofboileradditives.Thisshould
be donewiththeboilerisolatedfromthesystem.
2)Filltheboilerandhydronicsystemwithwatermeetingthefollowingrequirements:
  pHbetween6.5and8.5
  TotalSolidslessthan2500PPM
  Hardnesslessthan120PPM(7Grains/Gallon)
  Pressurizethesystemtoatleast12psiattheboiler
3) Checkallnewpipingforleaksandpurgepipingsectionsthatarelledwithair.SeetheNational Fuel Gas
Codeforadditionalinformationontestingandpurginggaslines.
4) Ventsystemmustbecompleteandfreeofobstructionsbeforeattemptingtoreboiler.Makesurethatthe
siliconecuretimecalledforintheventassemblyinstructionshaspassedbeforeringboiler.
5) Inspectalllinevoltagewiringforlooseoruninsulatedconnections.
6) Removethedustcapfromthecondensatetrap(Fig6.11).Addwatertothetrapuntilwaterrunsoutthe
condensatedrain.Reinstallthedustcap.

NOTE

safE lIghTINg aND OThEr PErfOrmaNCE CrITErIa wErE mET wITh ThE gas
TraIN assEmbly PrOVIDED ON ThE bOIlEr whEN ThE bOIlEr uNDErwENT
ThE TEsT sPECIfIED IN Z21.13.
warNINg
IF ANTIFREEZE IS ADDED To THE SySTEM, uSE oNE oF THE FoLLoWING
APPRoVED PRoDuCTS oR THEIR EquIVALENT:
FERNox ALPHI-11
GE-BETZ SENTINEL x500
NEVEr aTTEmPT TO fIll a hOT EmPTy bOIlEr.
warNINg
NEVER uSE A FLAME To CHECk FoR GAS LEAkS.
MAkE SuRE THAT THE AREA ARouND THE BoILER IS CLEAR AND FREE
FRoM CoMBuSTIBLE MATERIALS, GASoLINE AND oTHER FLAMMABLE
VaPOrs aND lIquIDs