DEALER PREPARATION CHECK LIST

RFM 60 Finishing Mowers

BEFORE DELIVERING MACHINE — The following check list should be completed. Use the Operator’s Manual as a guide.

r1. Assembled completed.

r2. Gearboxes filled with oil.

r3. All fittings lubricated.

r4. All shields in place and in good condition.

r5. All fasteners torqued to specifications given in Torque Chart

r6. All decals in place and readable. (See decal page.)

r7. Overall condition good (i.e. paint, welds)

r8. Operators manual has been delivered to owner and he has been instructed on the safe and proper use of the cutter.

r9. Warranty information has been registered online with Bush Hog.

Dealer’s

Signature

Purchaser’s

Signature

THIS CHECKLIST TO REMAIN IN OWNER’S MANUAL

It is the responsibility of the dealer to complete the procedures listed

above before delivery of this implement to the customer.

3

Page 5
Image 5
Bush Hog RFM 60 manual Dealer Preparation Check List