
Operating Instructions and Parts Manual | CHN71500 |
|
|
Set-Up (Continued)
Loading / Unloading The Tool
Always disconnect the tool from the air supply before loading/unloading fasteners. Choose which type of fastener you want to use for you project. Additional fasteners can be found at major home centers.
Loading the Tool
1.Push the latch button. Pull back on the magazine cover fully.
2.Insert a stick of pins into the magazine under the automatic nail length plate. Make sure pointed ends of pins are resting on bottom ledge of magazine when loading. Make sure pins are not dirty or damaged. Pins are marked for direction of loading.
3.Push the magazine cover forward until latch engages.
Unloading the Tool
1.Push the latch button. Pull back on the magazine cover fully.
2.Remove the pins from the magazine.
3.Push the magazine cover forward until latch engages.
4.Always unload all fasteners before removing tool from service. Unloading is the reverse of loading, except always disconnect the air supply before unloading.
Installing
1.Disconnect air supply from nailer.
2.Carefully place
3.Check that the WCE and trigger move up and down freely without sticking or binding.
Removing
1.Disconnect air supply from nailer.
2.Pry
Figure 8 - Loading the Nailer
Work Contact
Element
Figure 9 -
10www.chpower.com