Operating Instructions and Parts Manual

CHN71500

 

 

Operation

Firing the Nailer

1.Load fasteners (see Loading/Unloading the Nailer section).

2.Connect the air supply to the nailer.

An improperly functioning tool must not be used. Do not actuate the tool unless the tool is placed firmly against the work piece.

In Sequential Mode

1.Fully depress WCE.

2.Pull trigger. Fastener will be driven into workpiece.

Storage

The nailer should be stored in a cool dry location.

Depress WCE first...

Work Surface

Then pull trigger.

Work Surface

Figure 14

Maintenance

Clearing A Jam From The Nailer

1.Disconnect nailer from air supply.

2.Remove all nails from the magazine (see Loading/ Unloading). Failure to do so may cause the nails to eject from the front of the nailer.

3.Completely remove the three (3) small nose screws and the top nose plate to reveal the jammed fastener.

4.Using caution not to bend or damage the driver blade, use a pick or some other pointed object to pry free and clear the jammed fastener.

Nailer Repair

 

Only qualified personnel should repair the tool and they should use genuine Campbell

 

Hausfeld replacement parts and accessories, or parts and accessories which perform

 

equivalently.

Figure 15

 

Replacement Parts

 

Use only genuine Campbell Hausfeld service parts.Tool performance, safety and durability could be reduced if improper parts are used.When

ordering replacement parts, specify by part number.

Assembly Procedure For Seals

When repairing a nailer, the internal parts must be cleaned and lubricated. Parker O-lube or equivalent must be used on all o-rings. Each o-ring must be coated with O-lube before assembling. A small amount of oil must be used on all moving surfaces and pivots.

Technical Service

For information regarding the operation or repair of this product, please call 1-800-543-6400.

12www.chpower.com