Carrier 40RU manual TXV Sensing Bulb Location, Vertical Installation, Horizontal Installation

Models: 40RU

1 40
Download 40 pages 19.52 Kb
Page 14
Image 14
VERTICAL INSTALLATION

40RU

 

TXV

EQUALIZER LINE

UPPER

 

 

 

SENSING

 

 

SPLIT

BULB

 

 

 

 

 

 

 

SOLENOID

 

 

 

 

VALVE

 

 

TXV

 

SIGHT

AIRFLOW

15 DIAMS

 

GLASS

 

MIN

10

 

 

 

 

DIAMS

 

 

 

 

8 DIAMS

 

 

 

 

MIN

 

 

 

 

EQUALIZER

FILTER

 

TXV

LINE

LOWER

SENSING

 

DRIER

SPLIT

BULB

 

 

 

AIRFLOW

15 DIAMS

TXV

 

 

10

 

 

 

MIN

 

 

 

 

DIAMS

 

 

 

 

8 DIAMS

 

 

 

 

MIN

INDOOR

 

 

 

COIL

 

LEGEND:

TXV – Thermostatic Expansion Valve

NOTE: Component location arrangemetshown for field installation of sight glasses, solenoid valves, filter driers, and TXV sensing bulbs. The TXVs and equilizer lines are factory installed.

Fig. 9 - Face-Split Coil Suction and Liquid Line Piping (Typical)

C10726

FIRST ON/LAST OFF = B

VERTICAL INSTALLATION

FIRST ON/LAST OFF = A

HORIZONTAL INSTALLATION

C10688

Fig. 10 - Typical Evaporator Coil Connections (40RU)

LEGEND

TXV — Thermostatic Expansion Valve NOTE: The 8 o’clock position is shown above.

C10689

Fig. 11 - TXV Sensing Bulb Location

14

Page 14
Image 14
Carrier 40RU manual TXV Sensing Bulb Location, Vertical Installation, Horizontal Installation