Carrier 50VL---A Remove and Store in Job Files, I. Preliminary Information Model No, Temperatures

Models: 50VL---A

1 30
Download 30 pages 32.33 Kb
Page 30
Image 30
(Remove and Store in Job Files)

50VL-- A

START-UP CHECKLIST

(Remove and Store in Job Files)

I. PRELIMINARY INFORMATION MODEL NO.:

SERIAL NO.:

DATE:

TECHNICIAN:

II. PRESTART-UP (Insert check mark in box as each item is completed)

( ) VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT

( ) REMOVE ALL SHIPPING HOLD DOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS

( ) CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS

( ) CHECK THAT INDOOR (EVAPORATOR) AIR FILTER IS CLEAN AND IN PLACE

( ) VERIFY THAT UNIT INSTALLATION IS LEVEL

( ) CHECK FAN WHEEL, AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW TIGHTNESS

III.START-UP ELECTRICAL SUPPLY VOLTAGE COMPRESSOR AMPS

INDOOR (EVAPORATOR) FAN AMPS

TEMPERATURES

OUTDOOR (CONDENSER) AIR TEMPERATURE

DB

RETURN-AIR TEMPERATURE

 

 

 

 

 

 

DB

 

 

 

WB

COOLING SUPPLY AIR

 

 

DB

 

 

WB

PRESSURES

 

 

 

 

 

 

 

 

 

 

 

REFRIGERANT SUCTION

 

 

 

PSIG, SUCTION LINE TEMP*

 

REFRIGERANT DISCHARGE

 

 

 

 

 

 

PSIG, LIQUID TEMP{

 

( ) VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS

* Measured at suction inlet to compressor

{Measured at liquid line leaving condenser.

Copyright 2011 Carrier Corp. S 7310 W. Morris St. S Indianapolis, IN 46231

Edition Date: 01/11

Catalog No:50VL---08SI

 

 

Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.

Replaces: 50VL--- 07SI

30

Page 30
Image 30
Carrier 50VL---A Remove and Store in Job Files, I. Preliminary Information Model No, Temperatures, Pressures, 50VL--A