INSTALLATION STEP 5

Hang the Opener

Three representative installations are shown. Yours may be different. Hanging brackets should be angled, Figure 1, to provide rigid support. On finished ceilings, Figure 2, attach a sturdy metal bracket to structural supports before installing the opener. This bracket and fastening hardware are not provided.

Existing brackets from a previous installation may be fastened to the sides of the motor unit as in Figures 1 and 2, or to the mounting tabs as shown in Figure 3. Then continue with step 5 below.

1.Measure the distance from each side of the motor unit to the structural support.

2.Cut both pieces of the hanging bracket to required lengths.

3.Drill 3/16" pilot holes in the structural supports.

4.Attach one end of each bracket to a support with 5/16"-18x1-7/8" lag screws.

5.Fasten the opener to the hanging brackets with 5/16"-18x7/8" hex bolts, lock washers and nuts.

6.Check to make sure the rail is centered over the door (or in line with the header bracket if the bracket is not centered above the door).

7.Remove the 2x4. Operate the door manually. If the door hits the rail, raise the header bracket.

8.Grease the top and underside of the rail surface where the trolley slides with rail grease.

Structural

Supports

Lag Screws 5/16"- 18x1-7/8"

Measure

Distance

Hex Bolts 5/16"-18x7/8"

Lock Washers 5/16" Nuts 5/16"-18

Preferred range of bracket placement

 

— FINISHED CEILING —

Hidden

 

Support

 

 

Lag Screws

 

5/16"-18x1-7/8"

Bracket

(Not Provided)

Hex Bolts

(Not Provided)

5/16"-18x7/8"

 

 

Lock Washers 5/16"

 

Nuts 5/16"-18

Hex Bolts

 

5/16"-18x7/8"

 

Lock Washers 5/16"

 

Nuts 5/16"-18

 

 

Preferred range of

 

HARDWARE SHOWN ACTUAL SIZE

bracket placement

 

Lag Screw 5/16"-18x1-7/8"

Hex Bolt

 

 

5/16"-18x7/8"

Nut 5/16"-18

Lock Washer 5/16"

13